Lifts in Lviv: supply, installation, replacement
We supply, install, replace and maintain lifts (elevators) in Lviv from our branch at 51a Lisna St., phone 097 099-89-87: the Prozorro register lists 110 of our contracts in the Lviv region since 2017, 84 of them in the city itself.
You can buy a lift, replace an old one in your building or install a platform lift under a single contract for supply and installation. The total depends on the shaft, so we first come out for a free site survey.
Our contracts and projects in Lviv
| Task | Project | Work | Document |
|---|---|---|---|
| A larger lift in the same shaft | 164 Liubinska St. | a 630 kg cantilever lift with a 900 mm opening in place of a 320 kg lift with 650 mm doors; we widened and reinforced the openings | lift replacement without layout changes |
| Replacement in a residential building | 1 Vyhovskoho St. | modernization of a passenger lift with equipment replacement | contract No. 309 dated 27.09.2021, letter No. 32-vykh-98227 from the Zaliznychnyi District Administration |
| 14-stop lift replacement | 12 Mykolaichuka St. | major overhaul with equipment replacement, entrance 1 | contract No. 193/19 dated 26.06.2019, letter No. 36-vykh-88420 from the Shevchenkivskyi District Administration |
| Lift for people with disabilities | 27 Patona St. | modernization of a passenger lift, July 2026 contract | UA-2026-06-19-011513-a |
| The same | 78 Stryiska St. | modernization of a passenger lift, July 2026 contract | UA-2026-06-19-011118-a |
| The same | 45 A. Linkolna St. | modernization of a passenger lift, July 2026 contract | UA-2026-06-19-011731-a |
| The same | 29 A. Linkolna St. | modernization of a passenger lift, July 2026 contract | UA-2026-06-19-011831-a |
| Modernization in a block entrance | 5b Kniahyni Olhy St. | contract with the Frankivskyi District Administration, August 2026 | UA-2026-07-15-010005-a |
| Lift at an outpatient clinic | 477 Zelena St., Lung Health Centre | major overhaul with a lift installed to make the building accessible | UA-2023-10-03-001546-a, contract No. 1546 dated 18.10.2023, letter No. 337/1 |
| A shaft where there was none | 73 Stryiska St. | reconstruction of a hostel with an add-on lift shaft | UA-2024-04-11-012656-a |
| Platform lifts for the Academy of Arts | Lviv National Academy of Arts, 38 Kubiiovycha St. | two platform lifts for people with special needs | UA-2025-02-28-008184-a |
| Enclosed platform lift | Lviv, 2024 | an Izamet platform lift with a car, design, the shaft and turnkey installation | Izamet platform lift in Lviv |
The contracts are in the Prozorro register under EDRPOU 33860532, and each one can be checked by its number. The contract amount covers the full scope of work, so it cannot be taken as the price of the lift alone.

Where exactly we have contracts
| City | Contracts |
|---|---|
| Lviv | 84 |
| Vynnychky | 12 |
| Drohobych | 5 |
| Stryi | 5 |
| Truskavets | 4 |
| Total in the Lviv region | 110 contracts, 16 clients |
These are all our contracts in the region, including refurbishment of premises and roof repairs, as of July 2026.
What changes the cost estimate in Lviv buildings
The city's old housing stock brings a few recurring surprises. It is better to know about them before the budget is approved.
| What we find during the survey | What it means for you |
|---|---|
| Non-standard shaft size, the building has been altered | the lift is chosen to suit the shaft, which means a longer delivery time and usually a higher cost than a standard version |
| Shallow or damp pit | waterproofing and repair of the pit as a separate line item, otherwise the new equipment will rust |
| Building in the city centre, conservation area | approval from the cultural heritage protection authority is added, and this stage often takes longer than the installation |
| Occupied entrance, only one lift | a tighter work schedule: we notify residents in advance and state the timeframe before signing |
| No shaft at all | an extension with a foundation and a frame: it all depends on the wall, the space for the pit and the underground utilities |
How long it takes
The timeline depends on the condition of the shaft and the scope of building work; we give it after the site survey and write it into the contract. After installation and commissioning comes the technical inspection, and how long it takes depends on the inspection body.
Who this is for
- Business or hotel owner: we will select a passenger or panoramic lift for you, and for kitchens and warehouses there are dumbwaiters and freight lifts.
- Private house: see home lifts and what makes up the budget.
- Hospital or clinic: we have 14 contracts with the Lung Health Centre, including refurbishment of premises, and we have also worked at the outpatient clinic in Drohobych and the hospital in Stryi. Details are on the hospital lifts page.
- Institution, school, homeowners association (OSBB): there are platforms and lifts to make the building accessible, and a homeowners association can order a replacement directly.
What our clients in Lviv say
The Lung Health Centre (No. 337/1 dated 21.03.2024), the Zaliznychnyi District Administration (No. 32-vykh-98227 dated 09.08.2023) and the Shevchenkivskyi District Administration (No. 36-vykh-88420 dated 18.07.2023) sent us reference letters on their letterhead, with stamps. Lviv City Council honoured our work with a letter of thanks.
Frequently asked questions
How much does a lift cost in Lviv?
We will give you the total after the site survey, because a replacement in a dry shaft with straight walls and the repair of a shaft that has been flooded for years can differ in cost several times over. For comparison, there is a table of our contracts in Lviv with their numbers. The site survey and quote are free.
Are you based in Lviv, or do you come from Ivano-Frankivsk?
Our head office is in Ivano-Frankivsk, and in Lviv we have a separate branch at 51a Lisna St., phone 097 099-89-87. We have been working in the city since 2017.
How soon can you come for a site survey?
An engineer will contact you within one business day and arrange a time.
How long does a lift replacement take?
It depends on the shaft and the scope of building work. Shaft repairs, or replacing the only lift in an entrance, extend the schedule; we give you the timeline before the contract is signed.
A heritage building in central Lviv. Will you take it on?
We will, but allow more time: the cultural heritage protection authority gets involved. We have already handed over a panoramic lift for a heritage building in Chernivtsi, and in Lviv we worked in an academic building on Kubiiovycha St.
The building has no lift. Can a shaft be built onto it?
Often, yes. That is what we did at 73 Stryiska St. We start with a survey of the building: the wall, space for the pit, underground utilities, approvals.
Do you maintain lifts in Lviv?
Yes, including ones we did not install, but we inspect them first. For sites we maintain, the emergency line is available around the clock. The warranty terms are in the contract.
Last stop: your request
Lviv branch: 51a Lisna St., 097 099-89-87. Ivano-Frankivsk office: 050 585-39-28, 063 283-31-48, 096 901-76-50. Mon-Fri 09:00-18:00.
The site survey and quote are free, and an engineer will contact you within one business day. You can email us at portallift@gmail.com or write to us via the contacts page.